将项目约束正式落到 .specify/memory/constitution.md,并同步更新 plan、spec、tasks、checklist、agent 模板,使 Speckit 工作流默认遵循文档单一真源、范围收敛、Archive 隔离与校验闭环。
5.3 KiB
description
| description |
|---|
| Task list template for feature implementation |
Tasks: [FEATURE NAME]
Input: Design documents from /specs/[###-feature-name]/
Prerequisites: plan.md (required), spec.md (required), research.md, data-model.md, contracts/
Validation: Validation tasks are NOT optional in this repository. Every document change task set MUST include the applicable validation and ledger-sync tasks.
Organization: Tasks are grouped by user story so each document-maintenance slice can be completed, reviewed, and validated independently.
Format: [ID] [P?] [Story] Description
- [P]: Can run in parallel (different files, no dependencies)
- [Story]: Which user story this task belongs to (e.g., US1, US2, US3)
- Include exact file paths in descriptions
Path Conventions
- Main documents:
docs/design/01_Overview/,docs/design/02_Detailed_Design/,docs/design/03_Technical_Design/ - Governance documents:
docs/design/00_Management/ - Archive references:
docs/design/04_Appendix/Archive/ - Runtime guidance:
README.md,AGENTS.md,.specify/templates/
Phase 1: Scope & Source Confirmation (Shared Foundation)
Purpose: Confirm the source-of-truth set and impact boundary before editing.
- T001 Confirm target documents and exact chapters from spec.md
- T002 Confirm governing source-of-truth documents and allowed references
- T003 [P] Record scope judgment (in scope / needs confirmation / out of scope)
- T004 [P] Identify cross-document impacts: terminology, numbering, diagrams, links, ledger updates
Phase 2: User Story 1 - [Title] (Priority: P1) 🎯 MVP
Goal: [Brief description of the first independently reviewable document update]
Independent Test: [How to verify this story on its own]
Implementation for User Story 1
- T005 [US1] Update target document in docs/design/... with the approved scope
- T006 [US1] Sync affected anchors, references, numbering, or glossary terms in impacted docs
- T007 [US1] Run
make validate-file FILE=<target-file>and capture result - T008 [US1] Run any required cross-document validation (
make check-links,make validate-mermaid) and capture result - T009 [US1] Update
docs/design/00_Management/01_Project_Progress.mdif the change is important - T010 [US1] Update
docs/design/00_Management/03_Task_Checklist.mdif a tracked task is completed or materially changed
Checkpoint: User Story 1 is reviewable, validated, and ledger-synced independently
Phase 3: User Story 2 - [Title] (Priority: P2)
Goal: [Brief description of the second independently reviewable update]
Independent Test: [How to verify this story on its own]
Implementation for User Story 2
- T011 [US2] Update target document in docs/design/... with approved changes
- T012 [US2] Sync affected references, diagrams, or traceability entries
- T013 [US2] Run
make validate-file FILE=<target-file>and capture result - T014 [US2] Run any additional required validation and capture result
- T015 [US2] Update relevant management ledgers if applicable
Checkpoint: User Story 2 is reviewable and validated independently
Phase 4: User Story 3 - [Title] (Priority: P3)
Goal: [Brief description of the third independently reviewable update]
Independent Test: [How to verify this story on its own]
Implementation for User Story 3
- T016 [US3] Update target document in docs/design/... with approved changes
- T017 [US3] Sync affected supporting documents or guidance files
- T018 [US3] Run
make validate-file FILE=<target-file>and capture result - T019 [US3] Run any additional required validation and capture result
- T020 [US3] Update relevant management ledgers if applicable
Checkpoint: All planned document updates are independently reviewable and validated
Final Phase: Cross-Cutting Closure
Purpose: Ensure repository-wide consistency after all story slices are complete.
- T021 [P] Re-check source-of-truth alignment across all modified files
- T022 [P] Re-check relative links, stable anchors, and Mermaid consistency across all modified files
- T023 Prepare final summary with modified files, validation results, remaining risks, and next-step suggestions
Dependencies & Execution Order
Phase Dependencies
- Scope & Source Confirmation: No dependencies; MUST finish before content edits
- User Stories: Depend on confirmed scope and sources
- Final Phase: Depends on all selected user stories being complete
Within Each User Story
- Update target document before syncing impacted documents
- Complete content edits before validation
- Complete validation before ledger updates are marked done
- Complete ledger sync before final summary
Parallel Opportunities
- Scope analysis tasks marked [P] can run in parallel
- Different impacted supporting files can be updated in parallel if they do not touch the same file
- Validation tasks for different files can run in parallel when commands are independent
Notes
- Every task set MUST preserve the single-source-of-truth model
- Archive is for verification and traceability, not direct formal output replacement
- Do not omit validation or ledger tasks when they apply
- Avoid vague tasks; every task should name the file path and expected outcome